
Project typeHistoric building restoration
THE PROJECT
A solution developed for the actual project conditions.
A specialist intervention integrating new steel frames into historic architecture while highlighting the stained glass.
TECHNICAL SOLUTION
Systems and configurations used
01
Jansen Janisol Arte 2 steel frames, selected for their slender profiles and integration into existing openings.
02
Triple glazing incorporating stained glass.
03
A solution adapted to the restoration requirements and the building's distinctive architecture.
COMPLETED WORK
Completed project gallery
TECHNICAL DOCUMENTATION
Original project sections
The preview is generated from the original PDF. Open the original file separately to view it at full size. Technical documents remain in their original language.
WERU KLASS SCOPE